Sanctuary Update

Covenant Presbyterian Church Sanctuary Renovation: Full Timeline & Progress

Our Sanctuary Renovations have been underway since August 2024.

Quick Answer

As of April 2025, Covenant Presbyterian Church's sanctuary renovations are underway with the installation of oak panels and sheetrock wall boards, a project that commenced in August 2024. The renovations include a new solid pine ceiling, oak wall panels, and updated lighting, with major work expected to conclude by June 2025. Notably, stained glass pictures deemed in violation of the 2nd Commandment are being replaced with matching rose designs from other windows to maintain aesthetic consistency and adhere to biblical principles.

TIMELINE

AUGUST 2024 – REMOVAL OF FURNITURE, PEWS, CARPET, & ITEMS NOT PART OF FINISHED SANCTUARY.

SEPTEMBER 2024 – REMOVAL OF 8,000 SQUARE FEET OF CEILING – 1/4 PLASTER & 3/4 ACOUSTICAL TILES. OLD INSULATION WAS REMOVED FROM ENTIRE ROOM.

OCTOBER 2024 – ELECTRICAL WIRING INSTALLED & INSPECTED.

NOVEMBER 2024 – SPRAY FOAM INSTALLED IN ENTIRE ROOF STRUCTURE CAVITY TO PREVENT INTRUSION OF HEAT & MOISTURE, AS WELL AS TO MAINTAIN COMFORT IN SANCTUARY.

DECEMBER 2024 – CEILING FRAMING PREPARED FOR INSTALLATION OF SOLID PINE CEILING ACROSS ENTIRE SANCTUARY.

JANUARY 2025 – PINE CEILING FINISHED WITH SEVERAL COATS OF PRE-STAIN, STAIN, AND CLEAR COAT FINISHES.

FEBRUARY 2025 – INSTALLATION OF APPROXIMATELY 1,500 PINE CEILING BOARDS

MARCH 2025 – OAK PANELS FINISHED WITH SEVERAL COATS OF PRE-STAIN, STAIN, AND CLEAR COAT FINISHES.

APRIL 2025 – INSTALLATION OF OAK PANELS AND SHEETROCK WALL BOARDS

MAY & JUNE 2025

INSTALLATION OF CHANCEL WITH PULPIT & COMPLETION OF NARTHEX ENTRANCE

INSTALLATION OF SANCTUARY LIGHTING & CEILING FANS

TRIM WORK

HVAC SYSTEM DUCTWORK CLEANED & SANITIZED

CARPET INSTALLATION

PEW INSTALLATION

SOUND SYSTEM, ORGAN, & PIANO INSTALLED

REMOVAL OF STAINED GLASS PICTURES IN VIOLATION OF 2ND COMMANDMENT (IMAGES) AND REPLACED WITH MATCHING ROSE FROM OTHER WINDOWS.

Frequently Asked Questions

1 What is the current status of the Sanctuary renovations?

As of April 2025, the installation of oak panels and sheetrock wall boards is underway. The renovation project began in August 2024 with the removal of furniture and ceiling, and has progressed through electrical work, insulation, and ceiling installation.

2 When is the Sanctuary renovation expected to be completed?

The major renovation work is scheduled to conclude by June 2025. This includes the installation of the chancel, narthex entrance, lighting, fans, trim, HVAC cleaning, carpet, pews, and the sound system, organ, and piano.

3 What significant changes are being made to the Sanctuary's appearance?

The renovations include a new solid pine ceiling, oak wall panels, and updated lighting and ceiling fans. Notably, stained glass pictures deemed in violation of the 2nd Commandment are being replaced with matching rose designs from other windows.

4 Why were the stained glass pictures removed from the Sanctuary?

The stained glass pictures were removed because they were considered to be in violation of the 2nd Commandment, which prohibits images. They are being replaced with matching rose designs from other windows to maintain aesthetic consistency.

JOIN US FOR 11:00 AM & 6:00 PM WORSHIP SERVICES IN OUR NEWLY RENOVATED SANCTUARY!